| Sector | abcSugar | Tender Value | N.A. | Location | Haryana - India | Ref.No | 85516743 | Closing Date | 21 - Jul - 2025 | | | Tender for Various type repair jobs for maintenance of Plant and Machinery on Contract Basis - Dismantling, fabrication and erection of M.S. Structure and Platform (M.S. Channel, Plate, Angle, Beam etc.), Dismantling, fabrication & erection of M.S., G.I. Pipeline,
Dismantling, fabrication & erection of pipe accessories (bend, reducer, flanges, blind, nipple Tee, Dismantling of valves/NRV, Erection of valves/NRV, Dismantling and erection of angle/Sluice/NRV /Butterfly valve, Dismantling, fabrication & erection of hand railing,
Dismantling Fabrication & erection of S.S. pipe, Dismantling Fabrication & erection of Seamless pipe, Dismantling Fabrication & erection of seem less pipes Accessories (bend, reducer blind nipple, Tee, Flange), Dismantling, fabrication & erection of M.S. pipe,
Dismantling fabrication erection pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind), Dismantling fabrication erection of S.S. pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind), Dismantling/fabrication and erection of vapour/Exhaust Pipe,
Dismantling/fabrication and erection of vapour/Exhaust Pipe bend, Dismantling, fabrication & erection of M.S. coil, Repair/replacement of worn out boiler ducting, Dismantling, fabrication & erection of Sulphur melter /receiver, Dismantling, fabrication, repair & erection of Semikestner/vapour cell save all, Dismantling fabrication, repair & erection of quad body save all, Welding work of any leaky pipe line/vessel and tanks, Dismantling fabrication and erection of Evaporator Body umbrella, Dismantling of old tubes & fitting of new SS tube of Juice heater with hydraulic testing, Dismantling of old tubes & fitting of new SS tubes,
Replacement of cable trench, Dismantling & fabrication and erection of Expansion joint of FD Fan at Boiler, Dismantling fabrication and erection of juice Sulphiter So2 coils,
Dismantling fabrication & erection of So2 furnace primary cooler, Dismantling/ fabrication and erection of after burner, Dismantling & refitting and expanding of air heater tubes and trial, Dismantling & fabrication and erection of Expansion joint of ID Fan at Boiler, Cutting & refitting shell of Quad /Pan save -all for checking/cleaning, Dismantling, fabrication & erection of juice sulphitor SO2 Box, Replacement of worn out perforated plates of Steam entry at quad bodies, Cutting of portion of calenderia shell & its refitting for cleaning of calenderia of quad/juice heater, Replacement of worn out SO2 furnace Cooler pipes with dismantling & erection of cover, Dismantling & fabrication and erection of Expansion joint of Air Heater duct at Boiler, Dismantlig, Fabrication and erection of top cone of old Semi Kestner, S.S. lining of any equipment, Dismantling, Fabrication and erection of top cone of old vapour cell, Dismantling of old gear & erection of new planetary gear of crystallizers,
Fabrication and erection of M.S. grating for plate forms, Dismantling, fabrication & erection of SO2 furnace cooler shell, Erection of M.S. plates with M.S. angles, Fabrication of 'M.S. cross, Dismantlement, fabrication & erection of condensate box of quad/pan, Replacement of worn out steam jacket of Quad body, Replacement of bottom of syrup receiving tank,
Replacement of man hole, Fabrication of motor pump beds, Replacement of J pipe,
Dismantling, fabrication & erection of Heavy & Light tank Vacuum filter, Dismantling, fabrication & erection of Vacuum filter tray, Dismantling, fabrication & erection of Agitator of vacuum filter, Dismantling and fitting of Gearbox with motor/pump with motor, Replacement of FD fan damper, Dismantling, fabrication & erection of Internal/External Amonia Coils of Quad/ Vapour Cell/Juice Heater and Pan, Dismantling, fabrication & erection of expansion joint of economizer at boiler, Replacement of shaft & arms etc of Crystallizer, Replacement of gutter any station, Replacement of top cone of syrup sulphiter with replacement of portion of its shell, Dismantling and refitting of Juice Coils of Door Clarifier (After cleaning),
Replacement of any damage/worn out scrapper/rubber of DORR, Replacement of scrapper with rubber, Replacement of rubber of scrapper, Replacement of worn out structure, Column, Replacement of Damaged Rail line /square bar bridge and trolley of cane unloader,
Replacement of Damaged Rail line, Replacement of Damaged square bar, Patching work at any vessel/tanks, Replacement of wornout arms of crystallizer, Repairing and Strengthening of final molasses line support column, Replacement of down take pipe inside of evaporator body, Replacement of worn out columns of vacuum filter, Dismantling , Erection fitting of Primery coolers of Sulphur Furnace, Dismantling, Erecting fitting of secondary coolers of sulphur furnace, Dismantling, fabrication & Erection of Wet Scrubber shell with demister, Top & Bottom cone & perforated jacket, Dismantling & Erection of flow Meters, Erection fitting of flow meter, Repair/Replacement of Building Column, Dismantling |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|