|
Product Detail :
|
The project involves the development of closed-loop off-stream pumped storage projects at self-identified locations throughout Bihar. Developers are required to conduct pre-feasibility studies to assess site suitability, including technical, economic, and environmental evaluations. The projects must include the construction of two independent reservoirs without reliance on natural river systems. Pumped Storage Projects
|
| Tender Detail : |
The project involves the development of closed-loop off-stream pumped storage projects at self-identified locations throughout Bihar. Developers are required to conduct pre-feasibility studies to assess site suitability, including technical, economic, and environmental evaluations. The projects must include the construction of two independent reservoirs without reliance on natural river systems. |