Product Detail :
|
Design, construction, supply, installation, testing and commissioning of 30 MLD Sewage Treatment Plant (STP) at Rathdhana, Sonipat on SBR with advanced Biological Nutrient Removal Technology along with 18 MLD Ultra Filtration (UF) based Tertiary Treatment Plant (TTP) and other works contingent thereto including 3 months trial run one year defect liability period (DLP) and there after 5 years O and M on Turnkey and Lump Sum Basis.
|
Tender Detail : |
Design, Construction, Suppl... #*. Construction of 30 Mld Stp Based on Sbr Technology in the Existing Premises of Already Constructed 30 Mld Stp at Rathdhana, Sonipat Construction of 30 Mld Stp Based on Sbr Technology in the Existing Premises of Already Constructed 30 Mld Stp at Rath |