Product Detail :
|
Improvements to Riding Quality at Km /- /& /- /of Grand Western Trunk Road ,2.0 ,Removal of the BlackTopped (BT) surface to 50 to70mm depth using Milling machine,including conveying the milled waste materials away from the work site to an average distance including hire and running charges for themachine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers ,Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per10sqm for preparatory to another bituminous construction over it including cost of material, labour charges,rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 ,Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00 9.50mm,0.17cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (more than 5m width), Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 ,Calculation of SubTotal, GST and Total Amount carried out by system automatically ,Basic cost of value put to tender as per estimate ,Add GST at 18% ,Total Value put to Tender ,Quoted value ,Final Quoted Value ,Add GST at 18% of Final Quoted Value ,Total Value of Contract Including 18% of GST
|
Tender Detail : |
TN.11/Sl.No.02/CCR II /CRIDP Work 2025-26 #*. Improvements to Riding Quality at Km 0_2 . 1_0 and 6_300 . 6_700 of Grand Western Trunk Road |